1 research outputs found

    Branch and Bound Method to Solve Multi Objectives Function

    Get PDF
    This paper  presents  a  branch  and  bound  algorithm  for  sequencing  a  set  of  n independent  jobs  on  a single  machine  to  minimize sum of the discounted total weighted completion time and maximum lateness,  this problems is NP-hard. Two lower bounds were proposed and heuristic method to get an upper bound. Some special cases were  proved and some dominance rules were suggested and proved, the problem solved with up to 50 jobs
    corecore